- Krzemieniecka Street - Construction of a new bike path z. ..
Hi
In recent days, I noticed the construction of a path cycling (along with a series of foot) on the west side of street. Krzemieniec between Konstantynowska Retkińską and along the fence of the Botanical Garden. The trouble is that it is built, how else could, with the famous cube instead of asphalt, although about a year ago the City had promised that the cube is laid on only where there is a lot of underground installation and therefore are more likely to frequently breaking the surface (nomen omen little far-fetched argument, since no such street built with plates or cubes). Initially, I was hoping that the bar will be located only in the place of the old flagstones, which have so far around the highest point above. passed in the old section which is in good condition, however, the asphalt, which, after namalowaniu horizontal markings would make a perfect for new role. Unfortunately, today I noticed with obliterated is also no longer disputes section of asphalt, and the next already waiting for the arrangement of cubes. As far as I know the asphalt at this point was lying a good 30 years and was going after him without much difficulty, but it is not difficult to imagine how it will look like driving on the ankle after a few years (especially since this episode is the winter snow removal plow). Besides what is the meaning of financial picking a good road surface and putting in the new miejsu much less robust, while the other side of such street. Krzemieniec pavement condition calls for vengeance and change the surface on the other side would be much more desirable. In my opinion, this total waste of money. that could be spent even on uneven surfaces to replace the bike path at al. Street in the vicinity of ul. Pushkin (created some time ago by the paint marks on uneven pavement.)
Yours
Michael
0 comments:
Post a Comment